Projects
Geotechnical Investigations:
Soil Investigation for FOTCO Jetty-2. Fauji Oil Terminal & Distribution Co. Ltd.
Geotechnical Investiga-tions at Mazari and Tangri Facilities. BP Pakistan Exploration & Production Inc., Karachi
Geotechnical Investigations for Ghungro Facilities. BP Pakistan Exploration and Products Inc.
Confirmatory borings for White Oil Pipeline Crossings of PARCO. M/s CPECC-Techno Consortium / Papco.
Installation of Conductor Casing at different locations for BP Pakistan Exploration & Production Inc. M/s. BP Pakistan Exploration & Production Inc.
Technical Survey & Analysis of Jetty Structure / Installation at Port Qasim. Fauji Oil Terminal & Distribution Co. Ltd. (FOTCO)
 
Pile Foundations:
Piling works for Coastal Highway Project (Makran). NHA/Sacchal Engineering Works, Karachi.
Piling for Tower foundations of 500 KV Tarbella-Gatti T/Line at Barotha. WAPDA. Main Contractor: M/s. ICC (Pvt.) Ltd.
Piling works for World Trade Center, Karachi. World Trade Center / Meinhardt Pakistan (Pvt.) Ltd.
Makran Coastal Road Project – III. M/s. Sachal Engineering Works.
Piling for Pipeline Crossing over Nara Canal near Sukkur. Sui Northern Gas Pipelines Limited, Lahore.
Piling for bridge at Makran Coastal Highway Project (Gwadar-Pasni Section). M/s. Frontier Works Organization (FWO)
Piling for White Oil Pipeline Crossings of PARCO. M/s CPECC-Techno Consortium / Papco.
Execution of piles and pile caps for Chenab River Pipeline Crossing near Shershah. M/s. Sui Northern Gas Pipeline Co. Ltd. / NESPAK
Execution of pile for Manifold of OP-II, KPT M/s. China Harbor Engineering Co Group.
Piling works for Lyari Expressway, Karachi. Frontier Works Organization / Associated Consultants Ltd.
Drilling 2.7m diameter for installation of dolphin piles. M/s. China Harbor Engineering Co. / KPT
Piling for 220KV Transmission Line, Peshawar - Shahi Bagh Section. M/s. ICC (Private) Limited.
Execution of bored piles for Progas Causeway at Port Qasim. China Harbor Engineering Co. (Group).
 
Civil Works:
Construction of Storage Tank Dykes at Marazi Facility. BP Pakistan Exploration and Production Inc.
Maintenance and repairs to Fendering Units at OP-I, Keamari, Karachi. Karachi Port Trust.
 
Tube Wells:
Installation of Tube-wells at Pakland Cement Plant. Pakland Cement Factory Ltd., Karachi.
Water well drilling at Dureji – Testing for Reliability of Water Source. Premier Exploration Pakistan Limited.
Installation of Tube wells at Sawan Gas Field Development Project (Drilling and installation only) Associated Constructors Limited, Karachi.
Installation of tube wells at Water Supply Scheme Colony No.1 and Kachchi Abadi at Rahimyar Khan. Technical Associates / Ashfaque Associates.
 
PROJECTS IN HAND - AS ON 2-9-2005:
Reconstruction of OP-II. Karachi Port Trust. In joint venture with M/s. China Harbor Engineering Co.
Construction of cellar base and driving of casing. As per Blanket Purchase Order. BP Pakistan Exploration and Production Inc.
Construction and installation 60 ft. long conductor pipes. Orient Petroleum Inc. /Mohammad Bhatti & Co. & other parties
Geotechnical Investigation for Karachi Port Channel. Project & Development Department, Karachi Port Trust.
Execution of 2 meters & 1.2m diameter piles for Bridge over River Chenab at Sher Shah. Husnain Cotex Ltd., Multan.
Piling for 220KV Transmission Line, Barotha - Shahi Bagh Section Line #3 M/s. ICC (Private) Limited.
Soil investigations for Housing Project at Gwadur - Nobal Hart Builders & Developers. M/s. Nobal Hart Builders & Developers, Karachi.
 